Skip to content
All systems
CourseworkMALULEKE-KS

Tshimo Agri Network

CMPG 325 individual network design project — Tshimo Agri Supplies (CMPG325-2026-042)

  • Cisco Packet Tracer
  • VLANs
  • HTML
View the source
Started
August 2026
Last push
5 weeks ago
Commits this year
15

Written by AI from the repository · updated 7 weeks agoAI

The brief

A computer-networks semester project (CMPG 325): design the network for a fictional agricultural supplier, simulate it in Cisco Packet Tracer and isolate an assigned fault. The design has to absorb two future changes without re-addressing — a branch office that may open within 18 months, and eight new staff joining one department.

The design

  • Topology — one edge router (router-on-a-stick, with NAT/PAT to the internet service provider), a core switch with 802.1Q trunking, and an access switch per department.
  • Addressing — the 10.23.0.0/16 block, split into four business VLANs plus a management VLAN. Every VLAN gets a uniform /26 regardless of current headcount, so growth never forces a re-address.

How the work is kept

The repository separates a living design record (docs/: requirements, physical and logical topology, the addressing plan, change requests) from frozen graded submissions, one folder per milestone — later edits never rewrite what was handed in. Device configurations, connectivity evidence and the fault-isolation write-up each have their own place.

Where it stands

Milestone 1, the client design review, is complete; the later milestones follow during the semester.

Activity

How it's moving.

26 weeks agothis week
commits in the last 26 weeks
15

Latest commits

  1. Record project closure and confirmation that the Packet Tracer file works
  2. Close out project: README as finished record with rubric-to-evidence map, final status in control record
  3. Update README and control record for Final stage; mark M2 plan docs as historical
  4. Add branch-office design proposal and final video script with defence prep
  5. Add Final submission package: technical report, final Packet Tracer file, eFundi text
  6. Milestone 2 implementation, testing and fault-isolation evidence
  7. Add baseline Packet Tracer topology and physical build evidence
  8. Draft IOS configurations for switches, R1 and ISP, plus server setup

Skills

What it proves.

Can I measure visits?

Anonymous page-view counts (Vercel Analytics, no cookies) help me see what’s useful. Nothing is measured unless you say yes, and you can change this any time from the footer.